中交二公局承建青島軌道交通13號線一、二期正線140公里(單線)及一個車輛段和2個停車場的鋪軌任務(wù)、二期工程古鎮(zhèn)口車站—古鎮(zhèn)口南車站段落下部結(jié)構(gòu)及車站土建施工。項目鋪軌工程榮獲山東省市政工程安全文明工地稱號。
CCCC Second Highway Engineering Co., Ltd., is responsible for the
construction of 140 km (single line) of Qingdao Rail Transit Line 13 Phase 1
and Phase 2, track laying for 2 parking lots, construction of the substructure
and subsection construction of Guzhenkou Station-South Guzhenkou Station in
Phase 2. The track-laying project won the title of safe and civilized
construction site of Shandong municipal engineering.